SOLAR FARM WATER DELIVERY FOR Wickett
Water Runner delivers bulk water delivery for utility-scale solar farm projects across Wickett and the Denver City and Plains solar and oil corridor. We serve every water phase your project requires: dust control and compaction moisture during earthwork, batch water for concrete production, potable water for large crews, and high-purity water for panel washing and commissioning.
Based in West Texas with over 25 years of experience, our team deploys directly to remote and off-grid solar sites. We work with EPC contractors, utility-scale developers, and O&M asset managers to keep water off your critical path.
Serving Wickett, TX
Wickett anchors the heart of Dimmit County, a rural crossroads where the Wickett Ranch wind farm spans thousands of acres and oil leases thread the brush country along I-35. The region averages just 18 inches of rain a year and relies on the Edwards-Trinity aquifer, which often runs brackish and cannot support the volume demands of utility-scale wind or the emerging solar buildout. That makes bulk water delivery across South Texas the only reliable way to keep turbines spinning, crews hydrated, and dust down during construction and maintenance.
Inside the Wickett Solar Buildout
Three Water Grades. One Vendor.
Solar projects need different types of water for different jobs. We deliver all three from one TCEQ-licensed source, with one purchase order and one chain of custody for your QA/QC binder.
Potable Water
Clean drinking water for crew trailers, gate houses, hand-wash stations, and safety equipment. Meets federal drinking water standards and arrives with lab documentation.
Reverse Osmosis
Low-mineral water for general panel washing and as feed water for on-site DI polishing rigs operated by your wash subcontractor. Two delivery models, one source.
Deionized Water
Spot-free, ultra-pure water for commissioning washes and high-purity O&M cleaning. Protects panel performance, warranties, and long-term output.
Serving Wickett & Across South Texas
Wickett & Dimmit County
Active operations across the Wickett Ranch Wind Project and surrounding oil leases. Scheduled deployment from our Midland HQ with full project lifecycle coverage for wind farms and emerging solar sites.
ActiveSouth Texas Corridor
San Antonio, Uvalde, Eagle Pass, and surrounding brush country. Home base region with 24/7 availability for utility-scale wind and solar projects.
ActiveNew Mexico
Southeastern New Mexico and remote solar site builds requiring full water infrastructure from day one.
ServingNationwide
Advanced scheduling and coordinated deployment across the lower 48 for utility-scale solar and wind projects.
Planned DeploymentWhat We Deliver to Wickett & South Texas Wind & Solar Projects
Four services that cover the full life of the 300+ MW Wickett Ranch Wind Project and emerging solar sites, from groundbreaking through 30-plus years of operations.
Dust Control Water
Scheduled and on-call bulk water delivery for grading, gravel access roads, and active construction zones in the brush country. Keeps your site compliant and your neighbors happy.
Crew Drinking Water
TCEQ-source potable water for trailers, break stations, and safety stations. Scales from one tank to many as your headcount grows.
Turbine & Panel Wash Water
RO and DI water for routine turbine blade cleaning, solar panel washing, commissioning, and post-storm recovery. Two delivery options to fit your wash crew's setup.
Storage and Specialty
Bulk storage tanks for rent or purchase, plus water for concrete work, fire-watch refills, and revegetation seeding on exposed lease pads.
Why Wickett & South Texas Projects Choose Water Runner
A water vendor that understands the unique challenges of the South Texas brush country, the 300+ MW Wickett Ranch Wind Project, and the pace of utility-scale construction.
One Vendor, Every Water Type
Stop juggling three suppliers. One purchase order, one point of contact, one source of documentation across your entire wind farm, solar site, or oil lease operation.
Built for South Texas Energy
Operating since 1997 with deep roots in the region. Our drivers know the remote wind farm access roads, the brush country terrain, and the rhythm of construction schedules.
Documentation You Can Audit
TCEQ-licensed source, USDOT-registered carrier, lab tests on potable deliveries, and load tickets with every drop. Everything goes straight into your safety binder.
Concrete Production and Dust Compaction Water
Two water needs decide whether earthwork and foundations stay on schedule, and both show up on sites that sit past the end of the nearest water main. We deliver them from the same TCEQ-licensed source as everything else on your project, on one purchase order and one chain of custody.
Concrete Production
Batch and cure water for foundations, equipment pads, and slabs. When a site cannot draw the volume a pour requires, that water has to be hauled in and staged against the pour calendar rather than ordered the morning of. Tell us your schedule and we build delivery around it, with load tickets on every drop for your QA/QC binder.
Dust Compaction
Dust suppression on haul roads and active zones, plus the compaction moisture that brings subgrade to optimum water content before rolling. Graded pads that dry out and pads that take on rain both stall equipment, so we run scheduled routes through the dry stretches and on-call loads when a surface has to be reworked.
Both are available on scheduled routes and on call.
Wickett Water FAQs
Does Water Runner deliver bulk water to Wickett?
Yes. Water Runner delivers bulk water to utility-scale wind and solar projects across South Texas, including the Wickett Ranch Wind Project and surrounding oil fields. Wickett is a scheduled-deployment market with advance booking, served by fleet deployment from our TCEQ-licensed source in Midland, TX, roughly 140 miles away.
What types of water does Water Runner deliver for Wickett projects?
We deliver three treated water grades from one TCEQ-licensed source: potable water for crew supply and safety stations, reverse osmosis (RO) water for general turbine blade washing and as feed water for on-site DI polishing rigs, and deionized (DI) water for commissioning washes and high-purity O&M cleaning. Because the Edwards-Trinity aquifer often runs brackish, we also supply construction water from our external source for dust control, compaction moisture, and concrete production. Every grade is available from a single point of contact, on one purchase order.
When should we engage a water vendor for our Wickett project?
Engage Water Runner before mobilization day, ideally 60 to 180 days ahead of ground-break. Procurement teams use this lead time to onboard us as an approved vendor, validate insurance and credentials, and lock in volume-tiered terms. EPC superintendents and O&M asset managers can also reach us on shorter notice for surge needs, including post-storm wash campaigns and emergency response.
Does Water Runner provide documentation for our QA/QC and SWPPP binders?
Yes. Every delivery includes a load ticket with source, volume, date, and water grade. Potable deliveries include a water-quality lab test. SWPPP-compatible delivery tickets are formatted to drop directly into your BMP documentation binder, supporting EPA NPDES, TCEQ, OSHA 1926.51, and ANSI Z358.1 reporting requirements.
What is the Rapid Fill RO System and when is it available?
The Rapid Fill RO System is a dual-stage, high-recovery reverse osmosis plant built for high-volume panel wash and commissioning campaigns. It produces up to 400 GPM on-site, combining a 300 GPM primary stage with a 100 GPM secondary stage that recovers water from the reject stream, which cuts waste water discharge volume compared to single-pass RO. The system launches in Summer 2026, with pre-launch registration open now for priority scheduling.