How We Deliver
Water is not a commodity when your process depends on it. A load that arrives late, arrives short, or arrives without paperwork is not the same product as a load that arrives to spec with a report attached — and on a commissioning schedule or a hydrostatic test, the difference is measured in downtime, not in gallons.
Water Runner is a TCEQ-licensed bulk water supplier operating out of Midland, Texas. Every load we move, whether it is 300 gallons or three million, runs through the same five-step process and arrives with the same documentation. We call it the Blue Wave Standard, after Blue Wave Group, the parent company standing behind the work.
The Blue Wave Standard
-
1
Intake and spec
Before anything is scheduled, we establish what the water actually has to do. Potable, reverse osmosis, or deionized. The volume, the delivery window, the site access, the fill point, and any specification your process or your regulator requires. That specification is written down at intake, and it is the standard every later step is measured against.
-
2
Source and asset match
We match the specification to a source and to the right asset. Water Runner draws from its own wells reaching into the Edwards Trinity aquifer, and treats to spec where the application calls for R.O. or deionized water. Tankers are matched to the job — potable work moves in NSF/ANSI 61-compliant tankers, disinfected to AWWA C652 before the load is drawn.
-
3
Dispatch and confirm
Dispatch is centralised. One dispatch desk covers the Permian and Delaware Basins, the Texas Triangle and the corridors between them, which means a single call reaches every yard rather than a different vendor for every county. When the load is assigned you get confirmation of the dispatch and a delivery window, so your site knows what is coming and when to expect it.
-
4
Deliver and document
This is the step most suppliers skip. Every load arrives with:
- A water analysis report for the water on that truck.
- Chain of custody recorded on the bill of lading, from the source through the disinfected tanker to your fill point.
- Confirmation of tanker compliance — NSF/ANSI 61 for potable service, disinfected to AWWA C652.
You are not asked to take our word for what is in the tank. The documentation arrives with the water.
-
5
Follow-up and recurrence
After delivery we confirm the load met the spec set at intake, and where the requirement is ongoing we set the schedule rather than waiting for the next call. Recurring industrial, commercial and municipal accounts are planned around your operating calendar, and standby capacity can be arranged in advance for work where a gap is not an option.
Every load, documented
You are not asked to take our word for what is in the tank. Every load leaves with a water analysis report for the water on that specific truck, and a chain of custody recorded on the bill of lading from the source through the disinfected tanker to your fill point.
That is what step four exists for. The specification is agreed at intake, the water is tested against it, and the documentation arrives with the water — so both sides are looking at the same evidence, on the day, not arguing about it a week later.
The documentation, in one place
| What | Why it matters |
|---|---|
| TCEQ licensed | Water Runner operates as a licensed public water supplier under Texas Commission on Environmental Quality regulation. |
| NSF/ANSI 61 potable tankers | The standard governing materials in contact with drinking water. Potable loads move in compliant equipment. |
| AWWA C652 disinfection | The American Water Works Association standard for disinfecting water storage facilities. Tankers are disinfected to it before potable service. |
| Water analysis report per load | Lab results for the water on that specific truck, not a generic certificate. |
| Chain of custody on the BOL | A documented handoff from source to fill point, recorded on the bill of lading. |
| Analysis against the agreed spec | The intake specification is the standard each load is tested against, and the result travels with the load. |
Never subcontracted
Water Runner does not broker loads. The tanker that arrives is our tanker and the driver is our driver, which is what makes the chain of custody meaningful — there is no third party in the middle whose equipment and disinfection records we cannot vouch for. It is also what lets us surge: when a job needs more capacity than a single yard can put on the road, the capacity comes from inside the company.
Where we run
One dispatch desk, one set of standards, across the footprint below.
- West Texas and the Permian Basin
- Southeast New Mexico and the Delaware Basin
- Houston
- San Antonio
- Austin
- College Station
- Dallas–Fort Worth
- All lower 48 states with advance scheduling
Talk to us about a specification
Tell us what the water has to do and we will tell you how we will document it.